- Mar 13, 2012: Solar Powered Lap Around the Sun
- Dec 13, 2010: Moving in, Thanksgiving
- Nov 15, 2010: Counter Tops
- Nov 8, 2010: More Kitchen, Solar Update; 10,000 kW-hr!
- Nov 1, 2010: Kitchen Cabinets
- Oct 29, 2010: Kitchen!
- Oct 22, 2010: [Equinox Presentations]
- Oct 11, 2010: [Column, House Video]
- Sep 29, 2010: [Journal articles, Open House]
- Sep 21, 2010: Garden, Eco Bike Tour
- Sep 1, 2010: Landscaping, Rain Garden
- Aug 26, 2010: CERV, yard shaping
- Aug 10, 2010: Trim and Doors
- Jul 21, 2010: Rainwater System, Trim
- Jul 9, 2010: Siding Complete, Lighting
- Jun 30, 2010: Computerized Breaker Panel
- June 25, 2010: Tile, Rainwater
- Jun 22, 2010: Tiling, Concrete Floor
- Jun 17, 2010: Kitchen Design, Gable Home
- Jun 15, 2010: Tiling, Trim, Doors
- Jun 10, 2010: Lighting, Plumbing
- Jun 7, 2010: Painting, Siding
- May 28, 2010: Siding, Completed Drywall
- May 19, 2010: Siding and Drywall Near Completion
- May 12, 2010: More Siding and Drywall
- May 6, 2010: Siding, Drywall
- May 3, 2010: Recycling, Inspections, Siding
- Apr 26, 2010: [Equinox Foundation]
- Apr 22, 2010: Happy Earth Day!
- Apr 20, 2010: Soffits, Plumbing, Ducting
- Apr 14, 2010: [Equinox Thermal Mass]
- Apr 9, 2010: Roof Cont., Grading, Electrical
- Apr 5, 2010: Roof Continued
- Apr 1, 2010: Metal Roof
- Mar 22, 2010: Vernal Equinox
- Mar 9, 2010: Sealing, Thermal Images, Solar Production
- Mar 3, 2010: Initial Blower Door Testing
- Mar 1, 2010: Banquet Presentation
- Feb 23, 2010: Solar System Activated!
- Feb 19, 2010: [Equinox Windows]
- Feb 12, 2010: [Equinox Insulation]
- Feb 8, 2010: [Equinox Angles]
- Feb 4, 2010: Breaker Wiring, Inside Temperatures
- Jan 29, 2010: [House Energy]
- Jan 27, 2010: [Project Preface]
- Jan 21, 2010: Equinox Overhang Eaves
- Jan 12, 2010: Garage Door, Doors, Sun
- Jan 6, 2010: Windows
- Dec 23, 2009: NG Article, Decathlon, Solar Pond
- Dec 16, 2009: SIP Roof Panels
- Dec 18, 2009: Finishing Roof, Sun Pictures
- Dec 17, 2009: Roof Panels
- Dec 8, 2009: Interior Walls
- Dec 7, 2009: Interior Walls
- Dec 5, 2009: Interior Walls
- Dec 4, 2009: SIP Wall Pictures
- Dec 2, 2009: SIP Wall Installation
- Dec 1, 2009: Leveling Sill Plate, Starting on SIPs
- Nov 30, 2009: House Slab Poured
- Nov 23, 2009: Backfilling, Drains, Sill Plate
- Nov 20, 2009: Rainwater and Solar Conduit
- Nov 13, 2009: Garage Poured, Wiring Solar
- Nov 12, 2009: SIPs Arrival, Drains, More Solar
- Nov 11, 2009: Rainwater Tank and Solar Panels
- Nov 09, 2009: Pouring ICF Concrete
- Nov 6, 2009: ICF Foundation
- Nov 3, 2009: Concrete Footer
- Nov 2, 2009: Digging Foundation
- Oct 30, 2009: Solar Structure
- Oct 29, 2009: Installing Solar Structure
- Oct 23, 2009: Solar Rack Members
- Oct 21, 2009: Rainwater Tank Arrives
- Oct 20, 2009: Solar Post Holes
- Oct 19, 2009: Preparing for Solar Installation
- Oct 1, 2009: Solar System Design
- Sep 23, 2009: Breaking Ground
- Sep 21, 2009: The Site
Jun 10, 2010: Lighting, Plumbing
More lighting has been set up, along with the water meter and some toilets.
Jun 7, 2010: Painting, Siding
Painting was done over the end of last week and finished up today. The whole house was done in white for now using a zero VOC paint from Sherwin Williams.
May 28, 2010: Siding, Completed Drywall
Siding is almost complete as is the drywall.
May 19, 2010: Siding and Drywall Near Completion
Work continues to progress on the siding and drywall.
May 12, 2010: More Siding and Drywall
East side of the house has been sided and work is continuing on the back side. It’s been raining off and on, so if there is enough dry weather most of the siding should be installed by the end of this week.