- Mar 13, 2012: Solar Powered Lap Around the Sun
- Dec 13, 2010: Moving in, Thanksgiving
- Nov 15, 2010: Counter Tops
- Nov 8, 2010: More Kitchen, Solar Update; 10,000 kW-hr!
- Nov 1, 2010: Kitchen Cabinets
- Oct 29, 2010: Kitchen!
- Oct 22, 2010: [Equinox Presentations]
- Oct 11, 2010: [Column, House Video]
- Sep 29, 2010: [Journal articles, Open House]
- Sep 21, 2010: Garden, Eco Bike Tour
- Sep 1, 2010: Landscaping, Rain Garden
- Aug 26, 2010: CERV, yard shaping
- Aug 10, 2010: Trim and Doors
- Jul 21, 2010: Rainwater System, Trim
- Jul 9, 2010: Siding Complete, Lighting
- Jun 30, 2010: Computerized Breaker Panel
- June 25, 2010: Tile, Rainwater
- Jun 22, 2010: Tiling, Concrete Floor
- Jun 17, 2010: Kitchen Design, Gable Home
- Jun 15, 2010: Tiling, Trim, Doors
- Jun 10, 2010: Lighting, Plumbing
- Jun 7, 2010: Painting, Siding
- May 28, 2010: Siding, Completed Drywall
- May 19, 2010: Siding and Drywall Near Completion
- May 12, 2010: More Siding and Drywall
- May 6, 2010: Siding, Drywall
- May 3, 2010: Recycling, Inspections, Siding
- Apr 26, 2010: [Equinox Foundation]
- Apr 22, 2010: Happy Earth Day!
- Apr 20, 2010: Soffits, Plumbing, Ducting
- Apr 14, 2010: [Equinox Thermal Mass]
- Apr 9, 2010: Roof Cont., Grading, Electrical
- Apr 5, 2010: Roof Continued
- Apr 1, 2010: Metal Roof
- Mar 22, 2010: Vernal Equinox
- Mar 9, 2010: Sealing, Thermal Images, Solar Production
- Mar 3, 2010: Initial Blower Door Testing
- Mar 1, 2010: Banquet Presentation
- Feb 23, 2010: Solar System Activated!
- Feb 19, 2010: [Equinox Windows]
- Feb 12, 2010: [Equinox Insulation]
- Feb 8, 2010: [Equinox Angles]
- Feb 4, 2010: Breaker Wiring, Inside Temperatures
- Jan 29, 2010: [House Energy]
- Jan 27, 2010: [Project Preface]
- Jan 21, 2010: Equinox Overhang Eaves
- Jan 12, 2010: Garage Door, Doors, Sun
- Jan 6, 2010: Windows
- Dec 23, 2009: NG Article, Decathlon, Solar Pond
- Dec 16, 2009: SIP Roof Panels
- Dec 18, 2009: Finishing Roof, Sun Pictures
- Dec 17, 2009: Roof Panels
- Dec 8, 2009: Interior Walls
- Dec 7, 2009: Interior Walls
- Dec 5, 2009: Interior Walls
- Dec 4, 2009: SIP Wall Pictures
- Dec 2, 2009: SIP Wall Installation
- Dec 1, 2009: Leveling Sill Plate, Starting on SIPs
- Nov 30, 2009: House Slab Poured
- Nov 23, 2009: Backfilling, Drains, Sill Plate
- Nov 20, 2009: Rainwater and Solar Conduit
- Nov 13, 2009: Garage Poured, Wiring Solar
- Nov 12, 2009: SIPs Arrival, Drains, More Solar
- Nov 11, 2009: Rainwater Tank and Solar Panels
- Nov 09, 2009: Pouring ICF Concrete
- Nov 6, 2009: ICF Foundation
- Nov 3, 2009: Concrete Footer
- Nov 2, 2009: Digging Foundation
- Oct 30, 2009: Solar Structure
- Oct 29, 2009: Installing Solar Structure
- Oct 23, 2009: Solar Rack Members
- Oct 21, 2009: Rainwater Tank Arrives
- Oct 20, 2009: Solar Post Holes
- Oct 19, 2009: Preparing for Solar Installation
- Oct 1, 2009: Solar System Design
- Sep 23, 2009: Breaking Ground
- Sep 21, 2009: The Site
Sep 23, 2009: Breaking Ground
Ground has been broken!
Sep 21, 2009: The Site
Construction on the lot has begun!
Continue Reading