- Dec 13, 2010: Moving in, Thanksgiving
- Nov 15, 2010: Counter Tops
- Nov 8, 2010: More Kitchen, Solar Update; 10,000 kW-hr!
- Nov 1, 2010: Kitchen Cabinets
- Oct 29, 2010: Kitchen!
- Oct 22, 2010: [Equinox Presentations]
- Oct 11, 2010: [Column, House Video]
- Sep 29, 2010: [Journal articles, Open House]
- Sep 21, 2010: Garden, Eco Bike Tour
- Sep 1, 2010: Landscaping, Rain Garden
- Aug 26, 2010: CERV, yard shaping
- Aug 10, 2010: Trim and Doors
- Jul 21, 2010: Rainwater System, Trim
- Jul 9, 2010: Siding Complete, Lighting
- Jun 30, 2010: Computerized Breaker Panel
- June 25, 2010: Tile, Rainwater
- Jun 22, 2010: Tiling, Concrete Floor
- Jun 17, 2010: Kitchen Design, Gable Home
- Jun 15, 2010: Tiling, Trim, Doors
- Jun 10, 2010: Lighting, Plumbing
- Jun 7, 2010: Painting, Siding
- May 28, 2010: Siding, Completed Drywall
- May 19, 2010: Siding and Drywall Near Completion
- May 12, 2010: More Siding and Drywall
- May 6, 2010: Siding, Drywall
- May 3, 2010: Recycling, Inspections, Siding
- Apr 26, 2010: [Equinox Foundation]
- Apr 22, 2010: Happy Earth Day!
- Apr 20, 2010: Soffits, Plumbing, Ducting
- Apr 14, 2010: [Equinox Thermal Mass]
- Apr 9, 2010: Roof Cont., Grading, Electrical
- Apr 5, 2010: Roof Continued
- Apr 1, 2010: Metal Roof
- Mar 22, 2010: Vernal Equinox
- Mar 9, 2010: Sealing, Thermal Images, Solar Production
- Mar 3, 2010: Initial Blower Door Testing
- Mar 1, 2010: Banquet Presentation
- Feb 23, 2010: Solar System Activated!
- Feb 19, 2010: [Equinox Windows]
- Feb 12, 2010: [Equinox Insulation]
- Feb 8, 2010: [Equinox Angles]
- Feb 4, 2010: Breaker Wiring, Inside Temperatures
- Jan 29, 2010: [House Energy]
- Jan 27, 2010: [Project Preface]
- Jan 21, 2010: Equinox Overhang Eaves
- Jan 12, 2010: Garage Door, Doors, Sun
- Jan 6, 2010: Windows
- Dec 23, 2009: NG Article, Decathlon, Solar Pond
- Dec 16, 2009: SIP Roof Panels
- Dec 18, 2009: Finishing Roof, Sun Pictures
- Dec 17, 2009: Roof Panels
- Dec 8, 2009: Interior Walls
- Dec 7, 2009: Interior Walls
- Dec 5, 2009: Interior Walls
- Dec 4, 2009: SIP Wall Pictures
- Dec 2, 2009: SIP Wall Installation
- Dec 1, 2009: Leveling Sill Plate, Starting on SIPs
- Nov 30, 2009: House Slab Poured
- Nov 23, 2009: Backfilling, Drains, Sill Plate
- Nov 20, 2009: Rainwater and Solar Conduit
- Nov 13, 2009: Garage Poured, Wiring Solar
- Nov 12, 2009: SIPs Arrival, Drains, More Solar
- Nov 11, 2009: Rainwater Tank and Solar Panels
- Nov 09, 2009: Pouring ICF Concrete
- Nov 6, 2009: ICF Foundation
- Nov 3, 2009: Concrete Footer
- Nov 2, 2009: Digging Foundation
- Oct 30, 2009: Solar Structure
- Oct 29, 2009: Installing Solar Structure
- Oct 23, 2009: Solar Rack Members
- Oct 21, 2009: Rainwater Tank Arrives
- Oct 20, 2009: Solar Post Holes
- Oct 19, 2009: Preparing for Solar Installation
- Oct 1, 2009: Solar System Design
- Sep 23, 2009: Breaking Ground
- Sep 21, 2009: The Site
Dec 13, 2010: Moving in, Thanksgiving
Thanksgiving was successfully hosted at Equinox House!
Nov 15, 2010: Counter Tops
The counters were installed today. They will be back in the morning to do some final touches, but it’s pretty much done. Plumbers will be in on Wed to make sink connections and do rainwater connection for toilet supply.
Nov 8, 2010: More Kitchen, Solar Update; 10,000 kW-hr!
We’ve progressed a bit more on the kitchen. The double oven and vent hood have been installed. This Friday or next Monday the granite counter and sink will be installed.
Nov 1, 2010: Kitchen Cabinets
Kitchen cabinet installation was completed on Friday.
Oct 29, 2010: Kitchen!
The kitchen cabinetry finally arrived yesterday. Installation should finish today.