Dec 8, 2009: Interior Walls
December 8th, 2009
Here are a few pictures of the interior framing that was done yesterday.
Today was a miserable day, so work has been halted for the time being.
These wall frames are the master bedroom wall and master bedroom closet door wall
This wall will be built up another level and support the clerestory window panels. The platform is the utility chase where electrical, plumbing, and HVAC pipes will run. It will also have access for storage.
Next Post: Dec 17, 2009: Roof Panels
Previous Post: Dec 7, 2009: Interior Walls